The New York Harbor Railroad

This is a NEW layout in the beginning of operations development. The railroad is comprised of the New York Central Railroad's 30th Street Yard and the 30th Street Branch, commonly called the High Line. Also in operation is the Erie Railroad's 28th Street Float Yard with active car float service, as well as the Terminal Stores Building that was switched out by both Railroads. Not completed, but under construction is the Lehigh Valley Railroad's 27th Street Yard that also interacted with Terminal Stores.

Contact Info
Layout at a glance

Operating positions: New York Central: 30th Street Yard Master and Engineer
New York Central: 30th Street Branch 2 Road Crews and 1 St. John's Park Terminal Yard Master
Erie Railroad: 28th Street Yard Master and Engineer
Lehigh Valley Railroad: (UNDER CONSTRUCTION) 27th Street Yard Master and Engineer
Active Staging Master: Responsible for setting up and tearing down all in and out bound freight and mail trains on both the High Line and 30th Street.
Clerk: Writing Switch Lists and assigning cars from Active Staging bound to and from 28th Street and eventually 27th Street as well.

Total Crew: 9 to 10, eventually 12
Comments:

Most recent update: 2009 January 29
To Hartford Convention Layout Page
To OpSIG Home Page